Panel Upgrades

Electrical Panel Upgrades in Austin

If your panel is aging, overloaded, or you're adding EV charging or solar, an upgrade is often the right move. We size the new service for what you actually plan to do — not just what's there today.

EV charger ready

Capacity for current and future EVs.

Solar-ready

Properly sized for future solar or battery storage.

Insurance friendly

Modern panels with current safety features.

Code-compliant

Permits pulled, inspections passed.

Our process

How we deliver

Predictable, documented, and code-compliant — every time.

  1. 1Load calculation and current panel assessment
  2. 2Recommendation: 100A → 200A → 400A as appropriate
  3. 3Permit and utility coordination
  4. 4Service disconnect and replacement
  5. 5Reconnect, label, and document
  6. 6Final inspection

FAQ

Questions answered.

Don't see your question? Reach out — we'll respond within 48 hours.

How long does a panel upgrade take?

Most residential upgrades are completed in one day. There may be a temporary power interruption while the service is changed over.

When should I upgrade my panel?

Common triggers: adding EV charging, repeated breaker trips, old Federal Pacific / Zinsco / Challenger panels, insurance requirements, or a major remodel.

Do I need to upgrade for a Level 2 EV charger?

Not always — we run a load calculation first. Many 200A panels handle one charger comfortably.

Get in touch

Request service

Tell us a bit about the property and what you need.