Panel Upgrades
Electrical Panel Upgrades in Austin
If your panel is aging, overloaded, or you're adding EV charging or solar, an upgrade is often the right move. We size the new service for what you actually plan to do — not just what's there today.
EV charger ready
Capacity for current and future EVs.
Solar-ready
Properly sized for future solar or battery storage.
Insurance friendly
Modern panels with current safety features.
Code-compliant
Permits pulled, inspections passed.
Our process
How we deliver
Predictable, documented, and code-compliant — every time.
- 1Load calculation and current panel assessment
- 2Recommendation: 100A → 200A → 400A as appropriate
- 3Permit and utility coordination
- 4Service disconnect and replacement
- 5Reconnect, label, and document
- 6Final inspection
FAQ
Questions answered.
Don't see your question? Reach out — we'll respond within 48 hours.
How long does a panel upgrade take?
Most residential upgrades are completed in one day. There may be a temporary power interruption while the service is changed over.
When should I upgrade my panel?
Common triggers: adding EV charging, repeated breaker trips, old Federal Pacific / Zinsco / Challenger panels, insurance requirements, or a major remodel.
Do I need to upgrade for a Level 2 EV charger?
Not always — we run a load calculation first. Many 200A panels handle one charger comfortably.
Get in touch
Request service
Tell us a bit about the property and what you need.
